K-12 Schools |
Redwood High School Swim Facility
and Practice Gymnasium
Sir Francis Drake High School Swim Facility
New Dixon High School
Tamalpais High School Keyser Hall Replacement
Fitch Mountain Elementary School
VCUSD District Wide Modernization
Healdsburg High School - New Cafeteria, Media Access & Music Facility Building
Montgomery Field Project
|
Installation of new synthetic track, field turf, and new concessions stand at the existing field site. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Healdsburg High School Athletic Fields
|
Construction of a new athletic field facility including: all weather track, football and soccer fields, new tennis courts, baseball and softball fields, storage facilities, track and field event facilities, including new lighting systems, underground drainage and site utilities. |
Owner:
Contract
Amount: Architect: Contractor: |
![]() |
||
Healdsburg High School Lobby Remodel
|
The project consists of the complete restoration and remodeling of the lobby of the Smith Robinson Gymnasium on the campus of Healdsburg High School. The project includes new team rooms, snack bar, restrooms, lobby, wall of fame and covered outdoor waiting areas. It also upgrades the existing alarm systems through the entire gymnasium facility. The gymnasium will remain operational during construction. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Healdsburg Elementary School K-Wing
|
This project replaces the existing Kindergarten Wing at Healdsburg Elementary School. The project consists of four new state of the art kindergarten rooms, teachers workrooms, restrooms and associated site work. The architecture matches the existing facility, as it is an important architectural treasure of the Healdsburg community. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Santa Rosa High School Desoto Hall
|
The construction of a new twenty-five classroom, two story building is designed to match the existing historical buildings on the campus. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Santa Rosa High School Field Project
|
This project involved the complete renovation of Santa Rosa High School's track and field. Included in the renovation were new bleachers, lights, installation of synthetic track, installation of field turf, and a new concession stand. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Bayview Elementary
|
Complete modernization of existing classroom and bathroom facilities. Project includes a new 12,000 square-foot administration / library/ classroom building. All classroom spaces and bathrooms will receive new interior and exterior finishes. New electrical service, technology and ADA compliance upgrades are included in the scope of work. New roofs, exterior finishes, (including doors, frames, hardware, windows plaster and painting) will also be completed. Site work includes new paving and striping of playground and parking lot areas. New irrigation and planting is included in the project scope. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Healdsburg High School - Science & Technology Building
|
Construction of eight new computer laboratories and five science and chemistry laboratories. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Healdsburg Junior High School Multi-Purpose Building
|
Construction of a new 7,000 square foot multi-purpose building including a stage, public assembly area, cafeteria and food preparation areas. Covered walkways were installed unifying the three main buildings into a cohesive campus. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Steffan Manor Temporary School
|
After the devastating fire on March 6, 2001 that brought a portion of the original Steffan Manor Elementary School to the ground, Van Pelt Construction Services acted as the manager for a multiple-prime fast track project to install a temporary school site on the playing field of Annie Pennycook Elementary School. The project included the grading of the Pennycook fields, delivery and set-up of temporary trailer/classrooms, installation of electrical, mechanical and plumbing utilities, installation of a fire alarm and bell system, paving of walkways and parking areas, security fencing and ultimately the relocation of the undamaged school materials. This project was completed in eleven days. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Piner High School Buildings J and K
|
The construction of the all new Administration Building and a classroom building at Piner High School. |
Owner: Contract Amount: Architect: Contractor: |
![]() |
||
Piner Field Project
|
This project included the installation of synthetic track and field turf The construction of a new concession stand was also a part of this project. |
Owner: Contract Amount: Architect: Axia Contractor: |
![]() |
||
|