High School Field Restoration Project
General Information
District Project Development: January 2003 - March 2003
Architect: Carlile - Macy, Santa Rosa, CA
Design Phase: February 2003 - June 2003
Contractor: Robert A. Bothman, Inc., San Jose, CA
Construction: August 2003 - September 2004
Project Description
This project will include the restoration of the existing playfields including a new all-weather track.
Update

The project is complete and open to the public!!!!!

Fields Dedication Ceremony

Field Restoration Color Diagram - This diagram is an Adobe PDF File.  If you do not have Adobe Reader on your system, you can download it for free from Adobe's Website.
Project Progress Photos:  
10-08-04-001.jpg (20257 bytes)
Track Open For Use
10-08-04-003.jpg (17562 bytes)
Winter Maintenance at Baseball Field

Erosion Control Hydroseeding

Night Lights at Baseball Diamond

Night Lights Looking Towards Outfield

Overseeding Operations

New Storage Buildings

Grass Behind Baseball Field

Synthetic Track Color Coat

Track Striping

Seeding the Playfields

Grass is Growing!


Pole Vault Runway & Pit,
before color coat

Rubberized Track Surface,
before color coat


Color Coat at Track

Baseball Field Backstop Poles

Baseball Infield & Backstop

Off-Loading Soil Amendment

Track Paving

Tracking Paving

Musco Light Pole

North End Sidewalk

Goal Post

Soil Amendment


Dust Control Operations


Irrigation Piping

Light Pole Standard Base

Irrigation Mainline Trench at Ball Fields

Pour and Place Light Pole Base

Baseball field batting cage

University St. sidewalk access

Baseball field house

Tennis court, striped, netted and ready to go

Irrigation at track field

Long jump pit

Property Line Fencing
at Track Perimeter

Sidewalk to Track Area

Baseball Dugout & Sidewalk

Tennis Court Color Coat

Channel Drain at Track Curb

Fence Posts at Track Perimeter

Baseball Field Storage
Building Footing

Mark Van Pelt of VPCS and Bob Turner of Bothman, Inc.


Asphalt Paving at Tennis Courts


Base Rock Material Placement
at the Track


Petro-Grid Underlayment
at Tennis Courts


Tennis Court Subgrade


CMU Tennis Ball Wall


Tennis Ball Wall Footing


Lime treatment of track surface


Track Curb Radius


February - Wet Conditions

DO1c.jpg (30010 bytes)
Demolition of District Office

DO2c.jpg (28620 bytes)
Demolition of District Office

DO3c.jpg (29264 bytes)
Demolition of District Office

Bond Project Schedule